http://namtin.com.vn/wp-content/uploads/2019/03/IMAG2324_optimized.png
http://namtin.com.vn/wp-content/uploads/2019/03/slide-1_optimized.png
http://namtin.com.vn/wp-content/uploads/2019/03/DSC00412_1_optimized.png
http://namtin.com.vn/wp-content/uploads/2019/03/32b7c97f2cbfcee197ae_optimized.png
http://namtin.com.vn/wp-content/uploads/2019/03/DSC01884_optimized.png
http://namtin.com.vn/wp-content/uploads/2019/03/96f6ee98c555270b7e44_optimized-1.png

Waterproofing roof, toilet, looogia, balcony Project: FLC STAR TOWER BUILDING Address: 418 Quang Trung, Ha Dong, Hanoi Main contractor: C. HANOI STAR STAR JOINT STOCK COMPANY Some pictures of the...

Waterproofing Location: Bridgestone factory BTMV project - Dinh Vu Industrial Park - Hai Phong. Project: BTMW Main contractor: THE ZENITAKA CORPORATION-JAPAN

Construction of roof waterproofing Address: Thang Long II Industrial Park - Hung Yen Project: PANASONIC II Dental Clinic General contractor: NISHIMATSU Company

Location: Nguyen Co Thach - Nam Tu Liem - HN TCĐ: MB Land NTC: Thanh Nam Investment and Construction Joint Stock Company - COTANA Group Category: Epoxy paint basement B1,...

Location: 36 Hoang Cau, Dong Da, Hanoi TCĐ: GELEXIMCO Group Category: Epoxy floor paint, basement paint Duration: 2017 Implementation volume: »5,500 m2

Huoi Quang Hydropower Plant • Project: Epoxy paint for finishing interior and exterior of Factory • Location: Muong La District - Son La Province • Construction time: 2015 - 2017...

Nam Tin Construction and Trading Co., Ltd is pleased to receive the Certificate of Quality Management System according to ISO 9001: 2015. With the goal of taking customer satisfaction is...

Step 1: Preparation and surface treatment: + Surface keep dry, clean bavia. + The location of pitting, deep concave, steel hole position, hole hole will be patched with specialized repair...